LawsRules

Do You Need to Tell Your Utility About Plug-In Solar?

No state law lets a utility make you wait for approval for a qualifying plug-in kit. But several states do require you to tell the utility, and in states without a law you need its permission. Here's the rule where you live.

By David Álvarez GonzálezUpdated 3 min read

In this guide
  1. The rule in each state with a law
  2. In states without a law
  3. Why tell the utility even when you don't have to
  4. Free notice template
  5. FAQ

Short answer: in a state with a plug-in solar law, your utility can't make you wait for approval or charge a fee for a qualifying kit, but some states still require a notice: Virginia before installing, Maine within 30 days above 420 W, and Maryland or California if the utility asks. In a state without a law, a grid-tied kit needs the utility's approval first.

The rule in each state with a law

StateApprovalNoticeFees
UtahNot allowedNot requiredNot allowed
MarylandNot allowedUtility may require advance notice with capacity and safety detailsDisconnect switch may be charged in some cases
MaineNot allowedWithin 30 days, above 420 W onlyNot allowed
VermontNot allowedNone in the actNot allowed (overload costs recoverable)
ConnecticutNo interconnection agreementNone reportedNot allowed
ColoradoNot allowedNone reported; telling it is sensibleNot allowed
Virginia (Jan 1, 2027)Not allowedRequired before installing, SCC form; met if no reply in 15 daysNot allowed
California (Jan 1, 2027)Not allowedUtility may require a simple registrationNot allowed
New Jersey (Mar 1, 2027)Not allowedWatch for BPU guidanceNot allowed
New Hampshire (pending)Not allowedUtility may offer a way to record system sizeNot allowed

The live status of every state is on the 50-state map. Rules on approval and fees apply only to devices that meet the law's conditions: the wattage cap, the required certification and a standard outlet. A kit that doesn't qualify is just an unapproved generator.

In states without a law

Without a plug-in law, any solar system that feeds your home's wiring is "distributed generation" under your utility's interconnection rules. That usually means an application, a UL 1741-listed inverter, an approval before you switch on and sometimes a fee or inspection. The process was designed for rooftop systems, and many utilities have no category for a kit plugged into an outlet.

If you still want to try, ask in writing and describe the system precisely (see the template below). Some utilities will approve a very small system; many will say their rules don't cover it. Don't plug in a grid-tied kit without an answer: it can break your service terms and your lease and may affect your insurance terms. For specific states, see Texas, Florida, Pennsylvania and Massachusetts.

A panel that only charges a portable power station, with nothing plugged into your wall, doesn't connect to the grid, so no utility rule applies. See plug-in solar vs a power station.

Why tell the utility even when you don't have to

  • Smart meters see exports. A meter showing reverse flow from an unknown source can trigger a call or a visit.
  • Line worker safety. Certified kits shut off during outages, but crews like to know what's on their lines.
  • Insurance. A record that you installed a certified device, and when, helps if you ever make a claim. Tell your insurer too.
  • It's free and usually takes five minutes by email or online form.

Free notice template

Notice of a plug-in solar device
To: [Utility name], customer service / distributed generation Account number: [number] Service address: [address] I am writing to notify you that on [date] I installed [or: will install] a portable plug-in solar device at the address above [in accordance with (your state law, e.g. Virginia HB 395 / Maine LD 1730)]. Device: [make and model] Maximum AC output: [watts] W Certification: [UL 3700 / UL 1741, lab name, certificate number] Connection: standard 120-volt outlet; the device stops exporting during a grid outage. Number of devices at this meter: [1] Please let me know if you need anything else. [Name] [Phone and email]

Remove the bracketed law reference in states that don't need notice, or replace "notify" with "request approval" in states without a law. Keep a copy of what you send and any reply.

Frequently asked questions

Do I need utility approval for balcony solar?

Not in states with a plug-in solar law: Utah, Maryland, Maine, Vermont, Connecticut, Colorado and, once in force, Virginia, California, New Jersey and New Hampshire all stop utilities from requiring approval for a qualifying device. In states without a law, a grid-tied kit falls under normal interconnection rules, which do require approval.

Which states require you to notify the utility?

Virginia requires notice before installation on a form set by the State Corporation Commission (from January 1, 2027). Maine requires notice within 30 days for devices above 420 W. Maryland and California let utilities require notice or a simple registration. Utah, Vermont and Connecticut have no reported notice requirement.

Can my utility charge a fee for plug-in solar?

Not for a qualifying device in states with a plug-in law. Maryland lets a utility charge for a disconnect switch in some cases, and Vermont lets it recover costs if a device overloads its equipment.

What should a notice to my utility include?

Your name, account number and service address, the device's make and model, its AC output in watts, the certification (for example UL 3700 and the certificate number) and the installation date. Keep a copy.

Will the utility find out if I don't tell it?

A smart meter can show small amounts of power flowing back to the grid. In a state with a law and no notice rule that isn't a problem, but in a state without a law it can lead to a letter asking you to disconnect.

Update log

  • Guide published with rules for all states with a law.

Sources and official texts

  1. Utah Legislature: HB 340 (2025), enrolled bill text
  2. Vermont Legislature: Act 149 (S.202) as enacted
  3. pv magazine USA: Maine becomes third state to pass plug-in solar legislation (Apr 3, 2026)
  4. NHPR: New Hampshire joins states with laws on plug-in solar (July 8, 2026)
  5. CleanTechnica: Connecticut approves plug-in solar (May 30, 2026)

David Álvarez González

We track plug-in solar laws, product certifications and real-world savings across the US and the UK. Every guide links to the bill text, regulator or standard it relies on, and law pages carry a dated update log.